COMMUNITY CONSULTATION

The Campsie RSL Club is committed to working with the local community to ensure that the redevelopment plans for the Club’s landholdings are responsive to local needs and address resident concerns.

During March 2015, the Club held its stage 1 consultation events. The stage 1 community walks and design workshops provided valuable feedback to the project team and have informed the preparation of the Preferred Master Plan. The record of comments from the March events are available for download on the website together with the survey questionnaire.

In July 2015 the Club held its stage 2 consultation to understand community attitudes to its Preferred Master Plan. The Club has appreciated the valuable feedback provided by the local community at these events.